BIMbook

Private initiative · Independent BIM reference

BIMbook

The information chain for the AEC industry:
ISO 19650 → LOIN (ISO 7817-1) → BIM2FAB → AI & Robotics

A working reference for architects, engineers, contractors and asset teams — what to build, how much detail, in which order, and where AI fits. No vendor affiliation. No sales funnel.

Three things in 30 seconds

BIM is not software. It is a coordinated information chain — from the first design decision to the factory floor to the building in operation. Three standards hold it together, and one delivery model makes it pay for itself:

1 · WHAT

ISO 19650

Defines the information workflow: CDE, EIR, PIR, roles, states. The contract language.

2 · HOW MUCH

LOIN

Specifies the detail each deliverable must carry. Replaces LOD numbers with purpose-driven requirements.

3 · WHERE IT PAYS

BIM2FAB

Design–Build: the approved model is the factory work order. No handover loss. No re-interpretation.

The standards that hold it together (2026)

Two international standards form the contract backbone. The UK BIM Level framework (BIM Level 1/2, PAS 1192) was the historical engine that proved the model works — it is now superseded by ISO 19650 and remains useful as context, not as a specification reference.

ISO 19650 · 2018

Information management

The workflow standard: Common Data Environment, state transitions (work-in-progress → shared → published → archived), OIR → EIR → PIR, information deliverables and validation. Applies across the full built-asset life cycle — Part 1 covers the concepts, Part 2 covers construction and handover.

Read the ISO 19650 article →

ISO 7817-1:2024 · LOIN

Level of Information Need

The specification standard: for each deliverable, it defines which object classes, what geometric detail, which alphanumeric content, and how the deliverable is validated against a stated purpose. Replaces EN 17412-1:2020. The LOD 200/300/400 scheme is no longer the reference in procurement documents.

Read the LOIN article →

The full reference

Six articles, connected into one chain: the standard, the specification, the delivery frame, the technology layer, and the two foundational questions.

Standard

ISO 19650

The standard that runs BIM information work — CDE, EIR, PIR, the vocabulary that appears in every contract.

Read →

Standard

LOIN · ISO 7817-1

How much and what kind of information a deliverable must carry — the replacement for LOD numbers.

Read →

Delivery

BIM to FAB

Design–Build as the delivery frame: the approved model becomes the factory work order.

Read →

Technology

BIM × AI

AI operates on BIM, not instead of it. The information contract is the boundary.

Read →

Reference

What is BIM?

A working definition of BIM, separated from CAD and software, and what it is for in an AEC workflow.

Read →

Reference

LOD & Maturity

Where BIM projects actually break down: maturity, detail levels, and the UK BIM Level history.

Read →

BIM Pulse · buildingSMART International

Snapshot captured 14 September 2026. Items linked to the source; check buildingsmart.org for updates between refreshes.

buildingSMART International announces 2026 openBIM® Awards finalists

September 2026

Finalists announced; awards recognise openBIM projects across the industry.

IFCX – Core & Modularisation project update

26 August 2026

Final project plan passed bSI approval process — IFCX extends IFC for modular construction data.

buildingSMART International Council AGM 2026 — outcomes announced

August 2026

Board, SAC and International Council outcomes from the 2026 AGM.

buildingSMART International Summit Tokyo 2026 — tickets now open

Upcoming

Next international summit — registration open.

Start where the contract starts

Read the ISO 19650 article. Then the LOIN article. You will see why the information chain matters more than any software tool.

ISO 19650 in 20 minutes →